Exposed Aggregate Cost in Perth
Typical Perth prices for exposed aggregate and honed concrete, what changes the price, and how to get a fixed quote.
What affects the price
Size and shape
Bigger areas cost more overall but less per square metre. Lots of curves and cuts add labour.
Prep and excavation
Removing old concrete or pavers, digging out and setting levels all add to the job.
Mix and colour
Some stone blends and colours cost more than others.
Finish
Honed concrete needs grinding after it's laid, so it costs more than exposed.
Drainage
Soakwells, grates and falls to keep water away from the house.
Access
Tight sites can mean barrowing or pumping the concrete in.
Typical Perth prices
To give you a rough idea, these are typical ranges for our work in Perth. Plain grey concrete and liquid limestone are there for comparison. Your price depends on your site, and we'll give you a fixed quote once we've had a look.
| Finish or job | Guide price |
|---|---|
| Plain grey concrete | $100 to $150 per m² |
| Liquid limestone | $110 to $170 per m² |
| Exposed aggregate | $140 to $220 per m² |
| Honed concrete | $180 to $260 per m² |
| Pool surrounds and seamless pool edges | Price on inspection |
| Typical 40 to 50 m² exposed aggregate driveway | About $6,500 to $11,000 |
| Removing old concrete or pavers | $50 to $100 per m² |
| Decorative crossover | $3,000 to $5,000 |
*Pricing is subject to a site inspection and written quote. Council approval for a crossover is up to the owner.
Why small jobs cost more per m²
A small path or patio takes most of the same work as a bigger job: setting out, prep, formwork, getting the concrete delivered and finishing it off. That time is spread over fewer square metres, so the rate per m² is higher. On larger jobs the rate comes down. There's no minimum size, but small jobs usually have a minimum charge.
How our quotes work
We come out, measure up and talk through what you want. You get one fixed price with everything included, and quotes are free.
The only parts that can shift are earthworks and demolition, which can be hard to pin down months before we start. We'll tell you upfront if that applies to your job.
Paying
A 50% deposit on the day we start, when the materials arrive on site, and the balance on the day we finish.

Ready to talk about your job?
Send us a few details or give Matt a call. Quotes are free and there's no obligation.